PERAMALAN JUMLAH PERMINTAAN SPARE PART LCV BUSHING STRUTHBAR DENGAN MENGGUNAKAN METODE CROSTON DAN METODE SYNTETOS BOYLAN APPROXIMATION
Abstract
Full Text:
PDFReferences
Croston, J.D. 1972. Forecasting and Stock Control for Intermittent Demands. Operational Research Quarterly, 23: 289-303.
Gaikindo. 2016. (http://www.gaikindo.or.id/pasar-domestik-mobil-indonesiabaik-45-persen-pada-2016/. Diakses pada 1 April 2017).
Leven, E. & Segerstedt, A. 2004. Inventory Control with a Modified Croston Procedure and Erlang Distribution. International Journal of Production Economics, 90: 361–7.
Makridakis, S., Wheelwright, S.C., & Mcgee, V.E. 1999. Metode dan Aplikasi Peramalan. Alih Bahasa Hari Suminto. Edisi 2. Jakarta: Erlangga.
Mukhopadhyay, S., Solis, A.O., & Gutierrez, R.S. 2005. A Comparison of Four Method of Forecasting Lumpy Demand. Departement of Information & Decision Science. The University of Texas at El Paso.
Silver, Edward A., Pvke, D.F., & Peterson, R. 1998. Inventory Management and Production Planning and Scheduling. Edisi 3. New York: John Wiley & Sons.
Syntetos, A.A. & Boylan, J.E. (2001) On the Bias of Intermittent Demand Estimates. International Journal of Production Economics, 71, 457-466.
Willemain, T.R., Smart, C.N., & Schwarz, H.F. 2004. A New Approach to Forecasting Intermittent Demand for Service Parts Inventories. International Journal of Forecasting, 20: 375-387.
DOI: https://doi.org/10.17509/jem.v7i1.17887
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Yesi Kurnia Simamora, Entit Puspita, Nar Herryanto