Early Phase Process Evaluation: Industrial Practices

Zulfan Adi Putra

Abstract


Process route evaluation is a part of research and development (R&D) works in an industrial chemical project life cycle. In this early phase, good process evaluation, including process synthesis and designs, provide guidance’s on the R&D project. The paper aimed to collect practical methods used in this early phase process route evaluation from author’s 10 years of industrial experiences.  The collected methods range from forward-backward process synthesis, functional process design, use of cost estimation, and applications of Monte Carlo simulation. Led by a good project management (e.g. via a stage-gate approach) use of these methods have shown beneficial results. Some important results are strong arguments on whether or not the project will continue, as well as relevant technical and economic issues identified during this early phase process synthesis and design. Later on, these issues become guidance’s to the follow-up project, if it is continued.

Keywords


Stage-gate approach; Forward-backward process synthesis; Functional process design; Cost estimation; Monte Carlo simulation

Full Text:

PDF

References


Cooper, R. G. (1979). The dimensions of industrial new product success and failure. The Journal of Marketing, 1979, 93-103.

Hartmann, S., & Briskorn, D. (2010). A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of operational research, 207(1), 1-14.

Kemp, R., & Soete, L. (1992). The greening of technological progress: an evolutionary perspective. Futures, 24(5), 437-457.

Kline, S. J., & Rosenberg, N. (1986). An overview of innovation. The positive sum strategy: Harnessing technology for economic growth, 14, 640.

Putra, Z. A. (2016). Use of Process Simulation for Plant Debottlenecking. Indonesian Journal of science and technology, 1(1), 74-81.

Repenning, N. P., & Sterman, J. D. (2001). Nobody ever gets credit for fixing problems that never happened: creating and sustaining process improvement. California management review, 43(4), 64-88.

Ruekert, R. W., & Walker, O. C. (1987). Interactions between marketing and R&D departments in implementing different business strategies. Strategic management journal, 8(3), 233-248.

Souder, W. E. (1988). Managing relations between R&D and marketing in new product development projects. Journal of product innovation management, 5(1), 6-19.

Utterback, J. M., & Abernathy, W. J. (1975). A dynamic model of process and product innovation. Omega, 3(6), 639-656.




DOI: https://doi.org/10.17509/ijost.v1i2.3808

Refbacks

  • There are currently no refbacks.


Copyright (c) 2016 Indonesian Journal of Science and Technology

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Indonesian Journal of Science and Technology is published by UPI.
StatCounter - Free Web Tracker and Counter
View My Stats