Factory Layout Planning Using Activity Relationship Chart (ARC) and Activity Relationship Diagram (ARD) Method (Study Case: Kahuripan Foods Lembang)

Anisa Putri Rahmadani Lubis, Adelia Suyatno, Mohamad Faherza Hasyir Rahman, Septian Ade Isnanto, Vina Dwiyanti

Abstract


Kahuripan Food Lembang which is one of the SMEs (Small and Medium Industries) has invested in the food security sector of West Java. It is unfortunate that from the amount of potential owned by this industry, it does not have a factory layout according to The Indonesian Food and Drug Authority (BPOM) standards, thus hampering the production process. The method used in this research is a qualitative method with data collection techniques in the form of interviews, documentation, and observation. After obtaining the method to be used, then the layout is made with the selected method, namely the Activity Relationship Chart (ARC) and Activity Relationship Diagram (ARD) methods. Based on the results of the analysis and evaluation of the activity relationship of each department needed, it shows that the layout made can help streamline production and logistics activities because it has a flow of activities that have been adjusted to the degree of relationship as a basis for consideration and has been adjusted to the actual size needed.


Keywords


Activity Relationship Chart, Layout, Logistics

Full Text:

PDF

References


Alamsyah, A. D., & Suhartini, S. (2021, March). Usulan Rancangan Tata Letak Fasilitas Proses Replating Kapal dengan Menggunakan Metode ARC dan ARD (Studi Kasus di Sbu Galangan Pelni Surya). In Prosiding SENASTITAN: Seminar Nasional Teknologi Industri Berkelanjutan (Vol. 1, No. 1, pp. 65-71).

Aleisa, E. E. , & Lin, L. (2005). For effective facilities planning: Layout optimization then simulation, or vice versa . Proceedings of the 2005 Winter Simulation Conference, Orlando, FL.

Andy, Dwiky Alamsyah. Suhartini. 2021. “Usulan Rancangan Tata Letak Fasilitas Proses Replating Kapal Dengan Menggunakan Metode ARC Dan ARD”. Seminar Nasional Teknologi Industri Berkelanjutan 1. hal: 65-71.

De Carlo, F. , Arleo, M. A. , Borgia, O. , & Tucci, M. (2013). Layout design for a low capacity manufacturing line: A case study. International Journal of Engineering Business Management , 5 , 1–10

Fitri, R. (2022). Analisis Perancangan Ulang Tata Letak Fasilitas Produksi dengan Menggunakan Metode Systematic Layout Planning (SLP) di PT. Adi Satria Abadi. Jurnal Cakrawala Ilmiah, 1(6), 1261-1272.

Flessas, M. , Rizzardi, V. , Tortorella, G. L. , Fettermann, D. , & Marodin, G. A. (2015). Layout performance indicators and systematic planning. British Food Journal , 117 , 2098–2111.10.1108/BFJ-01-2015-0012

Ismail, D., & Derlini, D. (2017). Perbaikan Tata Letak Fasilitas Produksi Pada UD. Tahu Goreng Sky Di Tebing Tinggi Dengan Metode Activity Relationship Chart. JURUTERA-Jurnal Umum Teknik Terapan, 4(02), 1-6.

Jamalludin, A. Fuzi, H. Ramadhan.. 2020. “Metode Activity Relationship Chart (ARC) Pada Bengkel Nusantara Depok”. Jurnal Industrial Engineering Vol.1 No.2 hal: 20-22.

Kusuma, Y., Sumarauw, J. S., & Wangke, S. J. (2017). Analisis Sistem Manajemen Pergudangan Pada CV. Sulawesi Pratama Manado. Jurnal EMBA: Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi, 5(2), 602-6011.

Lofian, B., & Riyoko, S. (2014). Identifikasi Faktor Eksternal dan Faktor Internal yang Berpengaruh terhadap Kinerja UKM Mebel Rotan di Jepara. Jurnal Disprotek, 5(2), 8-15.

Patel, K., & Chotai, N. (2011). Documentation and Records: Harmonized GMP Requirements. Journal of Young Pharmacists : JYP, 3(2), 138-150. https://doi.org/10.4103/0975-1483.80303

Puspita, I. A., Iqbal, M., Pratami, D., & Pratomo, A. (2017). Production facility layout design using blocplan algorithm. Advanced Science Letters, 23(5), 3917-3920.

Rosyidi, M. R. (2018). Analisa tata letak fasilitas produksi dengan metode ARC, ARD, dan AAD di PT. XYZ. WAKTU: Jurnal Teknik UNIPA, 16(1), 82-95.

Siagian, M., Kurniawan, P. H., & Hikmah, H. (2019). Analisis faktor eksternal dan internal terhadap kinerja umkm di kota batam. Jesya (Jurnal Ekonomi dan Ekonomi Syariah), 2(2), 265-271.

Tanuwijaya, A., & Purwanggono, B. (2015). Penerapan Metode 5S dan Perancangan Fasilitas Peletakkan Material dan Peralatan Guna Eliminasi Waste Of Motion Dalam Perakitan Generator Set (Studi Kasus PT. Berkat Manunggal Jaya). Industrial Engineering Online Journal, 4(1), 1-7.

Tiara, T., Perdana, S., & Atikah, A. (2020). Analisis Metode 5S Pada Stasiun Kerja Pembuatan Rumah Boneka. Faktor Exacta, 13(3), 185-190.

Tongur, V., Hacibeyoglu, M., & Ulker, E. (2020). Solving a big-scaled hospital facility layout problem with meta-heuristics algorithms. Engineering Science and Technology, an International Journal, 23(4), 951-959.

Yuliarty, P., & Irfan, W. (2014). Perancangan Ulang Tata Letak Lantai Produksi Menggunakan Metode Systematic Layout Planning dengan Software Blocplan pada PT. Jurnal Ilmiah Teknik Industri, 2(3), 159-167.

Yulistio, A., Basuki, M., & Azhari, A. (2022). Perancangan Ulang Tata Letak Display Retail Fashion Menggunakan Activity Relationship Chart (Arc). Jurnal Ilmiah Teknik Industri, 10(1), 21-30.




DOI: https://doi.org/10.17509/jlsc.v2i2.62854

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 Universitas Pendidikan Indonesia

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.